• Fluid loss from muds and cement slurries to a permeable formation can significantly impact performance or damage the formation. If the cement slurry loses too much fluid, its strength can be compromised and require costly remedial intervention. The Model 4300 Fluid Loss Cell from Chandler Engineering, a leader in drilling... Learn More

  • The search for deeper reservoirs in harsher environments is testing the limits of drilling and completion fluids. Testing requirements have now exceeded the limits of most traditional instruments. Viscosity measurements are no exception. The Chandler Engineering design team lead the industry with the introduction of the Model 7600 Ultra High... Learn More

For technical assistance please contact: Support@a2zinc.net