For up-to-date information (including order forms for carpet, electric, AV and catering) visit the ATCE Exhibitor Resources Page

Polymer Technologies  

1733 W Road
PO Box E
Plainville,  KS  67663

United States
785-434-2474
http://www.polymerior.com
  • Booth: 530


Oilfield Polymer Gel Experts Pumping Slime Since the 1980's

Polymer Technologies and its team have provided EOR/IOR gel polymer applications and services since 1989. We specialize in Water Shut Off, Conformance, Vertical Profile Modification, Casing Leak, Annular Gel systems, and MIT/H5 applications. We also offer applications for improved wettability, improved injectivity, and clay stabilization applications. Polymer Technologies is proud to serve the oil and gas industry, and we look forward to continuing to provide real solutions that significantly reduce operating costs and increase hydrocarbon recovery. Our team is well versed in candidate selection, project design, and field implementation of each of these treatments. Polymer Technologies utilizes state-of-the-art equipment, knowledgeable field technicians, and a highly experienced technical team to bring real IOR solutions to the oilfield that yield greater oil and gas recovery and reduce LOE.

Our team works directly with operators to high-grade their producing assets that will yield the best rate of return. We then work on an economical approach with our design criteria and provide field implementation of each of our gel polymer applications.

Brands: Water Shut Off: Stop water influx overriding production. Casing Leaks: Treat leaks where cement cannot hold. Conformance & Profile Modification: Redirect injection fluid to unswept reservoir areas.


 Videos

PTTC/KU TORP IOR Talk

 Products

  • Water Shut Off
    Designs and implementation target influx of water production overriding the target production interval through coning or channeling due to vugs, natural fractures, or permeability contrast....

  • Water Shut Off:

    Designs and implementation target influx of water production overriding the target production interval through coning or channeling due to vugs, natural fractures, or permeability contrast. Polyacrylamide and x-linker injected into reservoir under frac gradient targeting zones that contribute large water volumes. The chemistry is hydrophilic and therefore bonds to the water-saturated portion of the reservoir. Gel Forms under temperature and pressure variables blocking water and modifying drainage pattern to the wellbore in favor of increased oil production. Typical results offer a 90% or more reduction in water and a 50% or more increase in oil production after treatment. Additional benefits and economic advantages can be realized through reduced expenses related to high water production volumes, such as electricity and chemical costs.

  • Casing Leaks
    Low MW polymers advantageous in treating tight or pinhole casing leaks where cement cannot penetrate or hold. The polymer can set up as a ringing gel after successfully penetrating the offending area....

  • Casing Leaks and Annular Gel Systems for MIT/H5:

    Low MW polymers are advantageous in treating tight or pinhole casing leaks where cement cannot penetrate or hold. The polymer can set up as a ringing gel after successfully penetrating the offending area. In addition, there is no need for permanent mechanical “solutions” (such as liners) that restrict flow and no drill out necessary with these applications making them much more cost-effective than other chemistries used for this application.

  • Conformance/Profile Modification
    Design and implementation target inefficient flood patterns to improve oil production by redirecting injection fluid to tighter, unswept portion of the reservoir....

  • Conformance:

    Design and implementation target inefficient flood patterns to improve oil production by redirecting injection fluid to a tighter, unswept portion of the reservoir. Conformance treatments address high-permeability streaks known as thief zones by blocking these areas deep into the reservoir, thus forcing the injection fluid around the gel block into tighter, oil-saturated rock. This treatment results in the mobilization of bypassed oil to the offset production wells, often resulting in significantly increased reserve recovery.

    Vertical Profile Modification:

    Design and implementation target inefficient vertical injection profile. In cases where multiple zones are being flooded from a single injection well, the vertical profile will favor one or two intervals with 70% or greater volume of the total daily barrels injected, creating a significant inefficiency in the flood pattern. Vertical Profile Modification Treatments address injection profile inefficiencies by directing injection fluids more proportionally in situations where multiple zones are open, thus increasing oil production.


Send Email

Type your information and click "Send Email" to send an email to this exhibitor. To return to the previous screen without saving, click "Reset".


Please contact spe.events@spe.org with any questions.